| Title |
The EUROnu Study for Future High Power Neutrino Oscillation Facilities |
| Authors |
- T.R. Edgecock
STFC/RAL, Chilton, Didcot, Oxon, United Kingdom
|
| Abstract |
The EUROnu project was a 4 year FP7 design study to investigate and compare three possible options for future, high power neutrino oscillation facilities in Europe. These three facilities are a Neutrino Factory, a neutrino superbeam from CERN to the Frejus Laboratory and a so-called Beta Beam. The study was completed at the end of 2012 and has produced conceptual designs for the facilities and preliminary cost estimates. The designs were used to determine the physics performance. These have been used to compare the facilities. This paper will describe the designs, physics performance and costs and summarise the recommendations of the study.
|
| Paper |
download TUPRI002.PDF [0.543 MB / 3 pages] |
| Export |
download ※ BibTeX
※ LaTeX
※ Text/Word
※ RIS
※ EndNote |
| Conference |
IPAC2014, Dresden, Germany |
| Series |
International Particle Accelerator Conference (5th) |
| Proceedings |
Link to full IPAC2014 Proccedings |
| Session |
Poster Session, Ribery Area |
| Date |
17-Jun-14 16:00–18:00 |
| Main Classification |
03 Particle Sources and Alternative Acceleration Techniques |
| Sub Classification |
A09 Muon Accelerators and Neutrino Factories |
| Keywords |
target, detector, factory, proton, linac |
| Publisher |
JACoW Publishing, Geneva, Switzerland |
| Editors |
Christine Petit-Jean-Genaz (CERN, Geneva, Switzerland); Gianluigi Arduini (CERN, Geneva, Switzerland); Peter Michel (HZDR, Dresden, Germany); Volker RW Schaa (GSI, Darmstadt, Germany) |
| ISBN |
978-3-95450-132-8 |
| Published |
July 2014 |
| Copyright |
|