| Title |
Twenty Years of Operation of the Elettra RF System |
| Authors |
- C. P. Pasotti, M. Bocciai, P. Pittana, M. Rinaldi
Elettra-Sincrotrone Trieste S.C.p.A., Basovizza, Italy
|
| Abstract |
Six thousand hours per year is the typical running scheduled time of the user-dedicated Elettra facility and twenty years is a significant amount of operating hours for the RF system. Failure and weak points of the installed equipment is discussed as well as the up-time statistic. The effectiveness of the predictive versus the extraordinary maintenance is presented. The gained operational experience has allowed the planning of the priorities to refit the installed components within a reasonable budget, in compliance with the user-operation time schedule and following the technical need of upgrading to improve the RF system performance.
|
| Paper |
download THPRI041.PDF [0.622 MB / 3 pages] |
| Export |
download ※ BibTeX
※ LaTeX
※ Text/Word
※ RIS
※ EndNote |
| Conference |
IPAC2014, Dresden, Germany |
| Series |
International Particle Accelerator Conference (5th) |
| Proceedings |
Link to full IPAC2014 Proccedings |
| Session |
Poster Session, Ribery Area |
| Date |
19-Jun-14 16:00–18:00 |
| Main Classification |
07 Accelerator Technology Main Systems |
| Sub Classification |
T06 Room Temperature RF |
| Keywords |
operation, klystron, cavity, storage-ring, booster |
| Publisher |
JACoW Publishing, Geneva, Switzerland |
| Editors |
Christine Petit-Jean-Genaz (CERN, Geneva, Switzerland); Gianluigi Arduini (CERN, Geneva, Switzerland); Peter Michel (HZDR, Dresden, Germany); Volker RW Schaa (GSI, Darmstadt, Germany) |
| ISBN |
978-3-95450-132-8 |
| Published |
July 2014 |
| Copyright |
|