| Title |
Progress and Status of the J-PARC 3GeV RCS |
| Authors |
- M. Kinsho
JAEA/J-PARC, Tokai-mura, Japan
|
| Abstract |
Big issue for the J-PARC 3GeV RCS was displacement of main magnets caused by last big earthquake because this made beam loss more than 400 kW beam power. Since realignment of main magnet and other components was essential to realize higher beam power and stable operation, this work has been done last maintenance period. To minimize amount of realignment work, we decided that not all components moved to designed regular potions but also minimum components moved to the position which was secured design acceptance 486 π mm mrad. Almost all components which are main magnets, rf cavities, and extraction magnets had to be moved in the range of 10 mm for horizontal, 3 mm for vertical and 9 mm for longitudinal, respectively. It was not necessary for the components installed in injection straight line to move because displacement of these components was less than ± 0.2 mm. At same time 400 MeV injection upgrade work should be done. Beam commissioning is planned from the middle of January 2014. The progress and status of the RCS in J-PARC are presented.
|
| Paper |
download THPME064.PDF [0.516 MB / 3 pages] |
| Export |
download ※ BibTeX
※ LaTeX
※ Text/Word
※ RIS
※ EndNote |
| Conference |
IPAC2014, Dresden, Germany |
| Series |
International Particle Accelerator Conference (5th) |
| Proceedings |
Link to full IPAC2014 Proccedings |
| Session |
Poster Session, Messi Area |
| Date |
19-Jun-14 16:00–18:00 |
| Main Classification |
04 Hadron Accelerators |
| Sub Classification |
A17 High Intensity Accelerators |
| Keywords |
injection, operation, linac, vacuum, power-supply |
| Publisher |
JACoW Publishing, Geneva, Switzerland |
| Editors |
Christine Petit-Jean-Genaz (CERN, Geneva, Switzerland); Gianluigi Arduini (CERN, Geneva, Switzerland); Peter Michel (HZDR, Dresden, Germany); Volker RW Schaa (GSI, Darmstadt, Germany) |
| ISBN |
978-3-95450-132-8 |
| Published |
July 2014 |
| Copyright |
|