| Title |
Measurements on the Superconducting 217 MHz CH Cavity During the Manufacturing Phase |
| Authors |
- F.D. Dziuba, M. Amberg, M. Basten, M. Busch, H. Podlech
IAP, Frankfurt am Main, Germany
- M. Amberg, K. Aulenbacher, W.A. Barth, S. Mickat
HIM, Mainz, Germany
- K. Aulenbacher
IKP, Mainz, Germany
- W.A. Barth, S. Mickat
GSI, Darmstadt, Germany
|
| Abstract |
Since in future the existing UNILAC (Universal Linear Accelerator) will be used as an injector for the FAIR (Facility for Antiproton and Ion Research) project, a new superconducting (sc) continuous wave (cw) linac at GSI is proposed to keep the Super Heavy Element (SHE) program at a competitive high level. In this context, a sc 217 MHz crossbar-H-mode (CH) cavity has been designed at the Institute for Applied Physics (IAP), Frankfurt University, and was built at Research Instruments (RI) GmbH, Germany. The cavity serves as a first prototype to demonstrate the reliable operability under a realistic accelerator environment and its successful beam operation will be a milestone on the way to the new linac. In this contribution measurements during the production process of the cavity as well as corresponding simulations will be presented.
|
| Funding |
GSI, HIM, BMBF Contr. No. 05P12RFRBL |
| Paper |
download TUPB075.PDF [1.637 MB / 3 pages] |
| Poster |
download TUPB075_POSTER.PDF [2.481 MB] |
| Conference |
SRF2015, Whistler, BC, Canada |
| Series |
International Conference on RF Superconductivity (17th) |
| Proceedings |
Link to full SRF2015 Proccedings |
| Session |
Poster Session |
| Date |
15-Sep-15 14:30–17:40 |
| Main Classification |
SRF Technology - Cavity |
| Keywords |
cavity, simulation, operation, resonance, linac |
| Publisher |
JACoW, Geneva, Switzerland |
| Editors |
Robert E. Laxdal (TRIUMF, Vancouver, BC, Canada); Jana Thomson (TRIUMF, Vancouver, BC, Canada); Volker RW Schaa (GSI, Darmstadt, Germany) |
| ISBN |
978-3-95450-178-6 |
| Published |
December 2015 |
| Copyright |
|