| Title |
Recent Progress of ESS Spoke and Elliptical Cryomodules |
| Authors |
- G. Olry
IPN, Orsay, France
|
| Abstract |
The ESS accelerator high level requirements are to provide a 2.86 ms long proton pulse at 2 GeV at repetition rate of 14 Hz. This represents 5 MW of average beam power with a 4% duty cycle on target. In a framework of collaboration between IPN Orsay, CEA Saclay and ESS, prototype spoke and medium and high beta elliptical cavities and cryomodules have been studied, constructed and tested. After a description of the ESS project and the accelerator layout, this paper will focus on the recent progress towards realization of the detailed design, the manufacturing of the first components of the prototype cryomodules and the first test results of some of the main critical elements such as SRF cavities and cold tuning systems.
|
| Paper |
download TUAA06.PDF [3.034 MB / 7 pages] |
| Slides |
download TUAA06_TALK.PDF [17.405 MB] |
| Conference |
SRF2015, Whistler, BC, Canada |
| Series |
International Conference on RF Superconductivity (17th) |
| Proceedings |
Link to full SRF2015 Proccedings |
| Session |
Facilities II |
| Date |
15-Sep-15 08:00–10:10 |
| Main Classification |
SRF Technology - Cryomodule |
| Keywords |
cryomodule, cavity, SRF, cryogenics, linac |
| Publisher |
JACoW, Geneva, Switzerland |
| Editors |
Robert E. Laxdal (TRIUMF, Vancouver, BC, Canada); Jana Thomson (TRIUMF, Vancouver, BC, Canada); Volker RW Schaa (GSI, Darmstadt, Germany) |
| ISBN |
978-3-95450-178-6 |
| Published |
December 2015 |
| Copyright |
|