| Title |
Heating Analysis and the Solutions of DCCT System for BEPCII |
| Authors |
- Y. Zhao, J.S. Cao, J. He, Y.F. Sui, L. Wang
IHEP, Beijing, People's Republic of China
|
| Abstract |
The BEPCII e⁺ DCCT is damaged due to a high temperature heating. After 8 years operating, it is not working properly in 2014. As the BEPCII is trying to reach high luminosity, the CT will be a defective component with the high beam current, therefore a spare one has replaced it. In order to determine the heating source, some experiments and simulations have been done. A new vacuum chamber structure has been designed to solve the problem. The analysis and result can be also applied to CT designs in the future.
|
| Paper |
download MOPB025.PDF [0.605 MB / 3 pages] |
| Conference |
IBIC2015, Melbourne, Australia |
| Series |
International Beam Instrumentation Conference (4th) |
| Proceedings |
Link to full IBIC2015 Proccedings |
| Session |
Poster Session 1 |
| Date |
14-Sep-15 16:00–18:00 |
| Main Classification |
Beam Charge Monitors and Other Instruments |
| Keywords |
vacuum, simulation, experiment, synchrotron, operation |
| Publisher |
JACoW, Geneva, Switzerland |
| Editors |
Mark Boland (SLSA, Clayton, Australia); David Button (ANSTO, Menai, Australia); Kathleen Riches (SLSA, Clayton, Australia); Volker RW Schaa (GSI, Darmstadt, Germany) |
| ISBN |
978-3-95450-176-2 |
| Published |
January 2016 |
| Copyright |
|