| Title |
Data Acquisition System for SuperKEKB Beam Loss Monitors |
| Authors |
- M. Tobiyama, J.W. Flanagan, H. Ikeda
KEK, Ibaraki, Japan
|
| Abstract |
The monitoring of the beam loss distribution along the accelerator is important in order to prevent damage of the vacuum components, and, in addition, to suppress the unnecessary irradiation of the accelerator elements. As it is not easy to construct the readout system to be synchronised to a fast timing signal, such as beam injection, a new 64-ch ADC system has been developed that samples the output of the loss monitor signal integrator with a fairly fast rate and automatically keeps the peak, mean and minimum of the data. The performance of the ADC system will be shown. The control system configuration that reads and resets the hardware interlock signal from the loss monitor signal integrator for the machine protection system (MPS) will also be presented.
|
| Paper |
download MOPB018.PDF [0.537 MB / 5 pages] |
| Poster |
download MOPB018_POSTER.PDF [0.362 MB] |
| Conference |
IBIC2015, Melbourne, Australia |
| Series |
International Beam Instrumentation Conference (4th) |
| Proceedings |
Link to full IBIC2015 Proccedings |
| Session |
Poster Session 1 |
| Date |
14-Sep-15 16:00–18:00 |
| Main Classification |
Beam Loss Detection |
| Keywords |
timing, injection, controls, EPICS, operation |
| Publisher |
JACoW, Geneva, Switzerland |
| Editors |
Mark Boland (SLSA, Clayton, Australia); David Button (ANSTO, Menai, Australia); Kathleen Riches (SLSA, Clayton, Australia); Volker RW Schaa (GSI, Darmstadt, Germany) |
| ISBN |
978-3-95450-176-2 |
| Published |
January 2016 |
| Copyright |
|