| Title |
The Role of Beam Diagnostics in the Rapid Commissioning of the TPS Booster and Storage Ring |
| Authors |
- P.C. Chiu, J. Chen, Y.-S. Cheng, K.T. Hsu, K.H. Hu, C. H. Huang, C.H. Kuo, D. Lee, C.Y. Liao, C.Y. Wu
NSRRC, Hsinchu, Taiwan
|
| Abstract |
The TPS is a newly constructed 3-GeV third-generation synchrotron light source featuring ultra-high photon brightness with extremely low emittance. After some hardware improvement especially demagnetization of chamber are completed, the commissioning of the beam in the booster ring began on December 12 and attained 3-GeV energy on December 16. The storage ring obtained its first stored beam and delivered synchrotron light on December 31. This report summarizes the role of beam diagnostic for hardware improvement and parameter tuning during TPS successful commissioning.
|
| Paper |
download MOBLA01.PDF [1.288 MB / 7 pages] |
| Slides |
download MOBLA01_TALK.PDF [17.486 MB] |
| Conference |
IBIC2015, Melbourne, Australia |
| Series |
International Beam Instrumentation Conference (4th) |
| Proceedings |
Link to full IBIC2015 Proccedings |
| Session |
Overview and Commissioning |
| Date |
14-Sep-15 11:00–12:30 |
| Main Classification |
Overview and Commissioning |
| Keywords |
booster, storage-ring, synchrotron, feedback, kicker |
| Publisher |
JACoW, Geneva, Switzerland |
| Editors |
Mark Boland (SLSA, Clayton, Australia); David Button (ANSTO, Menai, Australia); Kathleen Riches (SLSA, Clayton, Australia); Volker RW Schaa (GSI, Darmstadt, Germany) |
| ISBN |
978-3-95450-176-2 |
| Published |
January 2016 |
| Copyright |
|