| Title |
Commissioning of C-ADS Injector I |
| Authors |
- J.S. Cao, H. Geng, R.L. Liu, C. Meng, Y.F. Sui, F. Yan, Q. Ye
IHEP, Beijing, People's Republic of China
|
| Abstract |
As a test facility, the design goal of C-ADS Injector I is a 10mA, 10MeV CW proton linac, which uses a 3.2MeV normal conducting RFQ and superconducting single-spoke cavities for accelerating. The RF frequency of C-ADS Injector I accelerator is 325 MHz. In accordance to the progress of construction and considering the technical difficulties, the beam commissioning of C-ADS Injector I is carried out in 3 phases: Phase 1, with ECRIS + LEBT + RFQ + MEBT + TCM (two superconducting cavities), to reach 3.6 MeV; Phase 2, with ECRIS + LEBT + RFQ + MEBT + CM1 (seven superconducting cavities), to reach 5 MeV; Phase 3, with ECRIS + LEBT + RFQ + MEBT + CM¹⁺ CM2 (same as CM1), to finally achieve the design goal of C-ADS Injector I. This paper summarizes the beam commissioning in 3 phases and focusing on the third phase.
|
| Paper |
download TUPM6Y01.PDF [0.813 MB / 3 pages] |
| Slides |
download TUPM6Y01_TALK.PDF [3.617 MB] |
| Conference |
HB2016, Malmö, Sweden |
| Series |
ICFA Advanced Beam Dynamics Workshop on High-Intensity and High-Brightness Hadron Beams (57th) |
| Proceedings |
Link to full HB2016 Proccedings |
| Session |
Working Group D - Session 2 |
| Date |
05-Jul-16 16:00–18:00 |
| Main Classification |
Commissioning and Operations |
| Keywords |
rfq, cavity, emittance, solenoid, proton |
| Publisher |
JACoW, Geneva, Switzerland |
| Editors |
Mohammad Eshraqi (ESS, Lund, Sweden); Garry Trahern (ESS, Lund, Sweden); Volker RW Schaa (GSI, Darmstadt, Germany) |
| ISBN |
978-3-95450-185-4 |
| Published |
August 2016 |
| Copyright |
|