ESS Linac Plans for Commissioning and Initial Operations |
| Authors |
- R. Miyamoto, M. Eshraqi, M. Muñoz
ESS, Lund, Sweden
|
| Abstract |
Beam commissioning of the proton linac of the European Spallation Source (ESS) is planned to be conducted in 2018 and 2019. At this stage, the last 21 cryomodules are not yet installed and the maximum beam energy and power are 570 MeV and 1.4 MW, with respect to the nominal 2 GeV and 5 MW. The linac will be operated in this condition until the remaining cyromodules are installed in two stages in 2021 and 2022. On top of the common challenges of beam dynamics and machine protection, commissioning of a large scale machine, such as the ESS linac within a relatively short integrated time of less than 40 weeks imposes an additional challenge to the scheduling and planning. This paper lays out the current plans of the ESS linac for its beam commissioning as well as the initial operation.
|
| Paper |
download TUPM5Y01.PDF [0.197 MB / 6 pages] |
| Slides |
download TUPM5Y01_TALK.PDF [3.651 MB] |
| Conference |
HB2016, Malmö, Sweden |
| Series |
ICFA Advanced Beam Dynamics Workshop on High-Intensity and High-Brightness Hadron Beams (57th) |
| Proceedings |
Link to full HB2016 Proccedings |
| Session |
Working Group D - Session 2 |
| Date |
05-Jul-16 16:00–18:00 |
| Main Classification |
Commissioning and Operations |
| Keywords |
linac, rfq, target, quadrupole, dipole |
| Publisher |
JACoW, Geneva, Switzerland |
| Editors |
Mohammad Eshraqi (ESS, Lund, Sweden); Garry Trahern (ESS, Lund, Sweden); Volker RW Schaa (GSI, Darmstadt, Germany) |
| ISBN |
978-3-95450-185-4 |
| Published |
August 2016 |
| Copyright |
|