| Title |
Beam Commissioning Results for the CSNS MEBT and DTL-1 |
| Authors |
- J. Peng, M.T. Li, X.H. Lu
CSNS, Guangdong Province, People's Republic of China
- Y.W. An, S. Fu, L. Huang, M.Y. Huang, Y. Li, Z.P. Li, Y.D. Liu, S. Wang, S.Y. Xu, Y. Yuan
IHEP, Beijing, People's Republic of China
|
| Abstract |
The China Spallation Neutron Source (CSNS) is designed to deliver a 1.6GeV proton beam to a solid metal target for neutron scattering research. It will be constructed in two phases. In the 1st phase, the beam power is designed to be 100kW. In the 2nd phase, the beam power will be upgraded to 500kW by doubling the linac output energy and beam current. The accelerator complex consists of a 50keV H⁻ ion source, a 3MeV Radio Frequency Quadrupole (RFQ), a 80MeV Drift tube Linac (DTL), and a 1.6GeV rapid-cycling synchrotron (RCS). Until March 2016, the front end and the first tank of DTL have been fully commissioned. The primary design goals of peak current, transverse emittance and beam energy have been achieved. This paper reports on the methods and the results of the commissioning.
|
| Paper |
download TUPM2Y01.PDF [0.300 MB / 4 pages] |
| Slides |
download TUPM2Y01_TALK.PDF [2.398 MB] |
| Conference |
HB2016, Malmö, Sweden |
| Series |
ICFA Advanced Beam Dynamics Workshop on High-Intensity and High-Brightness Hadron Beams (57th) |
| Proceedings |
Link to full HB2016 Proccedings |
| Session |
Working Group D - Session 1 |
| Date |
05-Jul-16 14:00–15:40 |
| Main Classification |
Commissioning and Operations |
| Keywords |
DTL, emittance, rfq, linac, cavity |
| Publisher |
JACoW, Geneva, Switzerland |
| Editors |
Mohammad Eshraqi (ESS, Lund, Sweden); Garry Trahern (ESS, Lund, Sweden); Volker RW Schaa (GSI, Darmstadt, Germany) |
| ISBN |
978-3-95450-185-4 |
| Published |
August 2016 |
| Copyright |
|