| Title |
Operational Experience of CW SRF Injector and Main Linac Cryomodules at the Compact ERL |
| Authors |
- H. Sakai, K. Enami, T. Furuya, E. Kako, Y. Kondo, S. Michizono, T. Miura, F. Qiu, M. Sato, K. Shinoe, T. Shishido, K. Umemori, K. Watanabe, Y. Yamamoto
KEK, Ibaraki, Japan
- E. Cenni
Sokendai, Ibaraki, Japan
- M. Sawamura
JAEA, Ibaraki-ken, Japan
|
| Abstract |
We developed ERL injector cryomodule and main linac for Compact ERL (cERL) project. The injector cryomodule includes three 2-cell L-band superconducting cavities. The main linac cryomodule includes two 9-cell L-band superconducting cavities. After construction of cERL injector and recirculaton loop, beam operation was started with 20 MeV beam and after precise beam tuning, energy recovery operation was achieved with more than 80uA. Injector and main linac cavity were stable for ERL beam operation with Digital LLRF system. Field emission is the severe problem for main linac and heating of HOM coupler is the problem for injector. We mainly describe the cavity performances of two cERL cryomodules during long-term beam operation.
|
| Paper |
download WEIBLH2054.PDF [1.459 MB / 4 pages] |
| Slides |
download WEIBLH2054_TALK.PDF [13.191 MB] |
| Conference |
ERL2015, Stony Brook, NY, USA |
| Series |
ICFA Advanced Beam Dynamics Workshop on Energy Recovery Linacs (56th) |
| Proceedings |
Link to full ERL2015 Proccedings |
| Session |
WG4 ERL and SRF, Stability, Synchronization, Special Requirements, HOM Dumping |
| Date |
10-Jun-15 10:45–12:25 |
| Main Classification |
WG4 ERL and SRF, Stability, Synchronization, Special Requirements, HOM Dumping |
| Keywords |
cryomodule, operation, linac, cavity, radiation |
| Publisher |
JACoW, Geneva, Switzerland |
| Editors |
Sergey Belomestnykh (FNAL, Batavia, IL, USA); Caitlin M. Hoffman (BNL, Brookhaven, NY, USA); Volker RW Schaa (GSI, Darmstadt, Germany) |
| ISBN |
978-3-95450-183-0 |
| Published |
September 2015 |
| Copyright |
|